Targeted Charging Review: How TCR charges and bands work
The Targeted Charging Review (TCR) changed how businesses pay to be connected to the electricity network, replacing usage-based residual charges with fixed daily TCR charges set by band.
This guide explains why Ofgem made the change, which charges were affected, how TCR bands are assigned, how the TCR charges appear on bills, and what to do if a band looks wrong.
What is the Targeted Charging Review?
The Targeted Charging Review (TCR) was an assessment made by Ofgem in 2019 of how the costs of running Great Britain’s electricity networks are recovered from users.
Its main outcome was a change to “residual” network charges, so called because they recover the network costs left over after unit charges per kWh are applied.
These charges previously rose with each unit consumed during peak times, but are now billed as a fixed daily cost, set by the TCR band each business is placed in according to its size. These fixed residual charges are commonly known as “TCR charges”.
Ofgem made the change because businesses able to cut peak demand or generate their own power could reduce their share of these charges. The networks still needed funding, so the costs they avoided fell on everyone else.
The reforms were introduced in two stages, with DUoS distribution costs changing from April 2022 and transmission costs from April 2023.
Why did Ofgem change network charging?
Ofgem found that the way residual charges were recovered had become unfair and was distorting how businesses used and generated electricity. Its review identified three main problems with the previous system:
- Charges could be avoided: Residual charges were linked to how much electricity a business drew from the grid, at peak times. Businesses able to shave their peak demand or install on-site generation could reduce their bills sharply, even though they still relied on the network like every other customer.
- Costs shifted to others: The total cost of the networks stayed the same, so every pound avoided by one business was recovered from those unable to change their usage, including households and smaller firms.
- Investment decisions were distorted: Some on-site power generation and storage projects were built mainly to avoid network charges rather than because they offered good value to the energy system.
Ofgem’s solution was to separate residual charges from usage entirely, removing the distorted incentives and asking every business to pay in proportion to its size instead.
Flexibility is still rewarded in other ways. Time-banded DUoS unit rates and schemes such as the Demand Flexibility Service provide incentives to reduce power demand at peak times.
What charges did the TCR change?
The TCR changed three elements of how network costs are recovered. In each case, only the residual part of the charge moved to a fixed basis, while the parts reflecting the location and time of electricity use stayed in place.
TNUoS residual charges
Transmission Network Use of System (TNUoS) charges pay for the high-voltage national grid.
Before the TCR, half-hourly metered businesses paid the residual share based on their demand during the three winter peaks each year, known as Triads, while smaller businesses paid it through unit rates.
From April 2023, the residual share became a fixed daily charge for all businesses, again set according to their charging band.
The locational element of TNUoS is unaffected, so zonal charges still vary by region to reflect the cost of transporting electricity across the grid.
DUoS residual charges
Distribution Use of System (DUoS) charges pay for the local networks that carry electricity from the transmission grid to homes and businesses.
Before the TCR, the residual share of these charges was built into unit rates, so businesses paid it on every kWh they used.
From April 2022, this residual share became a fixed daily charge, set according to the business’s charging band.
The time-of-use element of DUoS is unaffected, with unit rates still varying across red, amber and green time bands, so using electricity at peak times still costs more.
Embedded benefits
Embedded benefits were payments that smaller generators connected to local networks, such as solar farms and gas engines, could earn because their output reduced the demand seen by the transmission grid.
As this demand determined how certain charges were shared out, these generators effectively received a share of the residual costs that other users paid.
Ofgem found these payments created the same distortions as the old residual charges, rewarding generators for avoiding costs rather than for providing value, so the TCR reduced them as part of the same reforms.
How do TCR bands work?
A business’s TCR band determines the fixed daily residual charge it pays for both DUoS and TNUoS.
Grouping sites into bands means larger sites contribute more than smaller ones, rather than every business paying the same flat amount.
All domestic customers share a single band, while non-domestic customers are placed into one of four bands through the following steps:
1. Identifying the charging group and measuring the size of the site
Each site is first placed into a charging group, based on the voltage it connects at and whether it has an agreed capacity.
The group determines how the site’s size is measured for banding:
| Charging group | Typical businesses | How size is measured |
|---|---|---|
| Low voltage, no agreed capacity | Smaller businesses on standard or smart meters, such as shops, cafés and small offices | Annual electricity consumption, in kWh |
| Low voltage, with agreed capacity | Larger businesses with half-hourly meters, such as supermarkets, large offices and smaller factories | Agreed maximum import capacity, in kVA |
| High voltage | Large energy users with their own substation, such as manufacturing plants, hospitals and data centres | Agreed maximum import capacity, in kVA |
Low and high-voltage sites with an agreed capacity are measured in the same way, but are banded separately, as each group has its own thresholds.
Each site’s size figure (in kWh or kVA) is based on two years of data collected before the banding period begins, and is compared with the band thresholds to set its band.
New connections without this history are banded using their agreed capacity or estimated annual consumption.
2. Setting the band thresholds
Band thresholds are set nationally at the 40th, 70th and 85th percentiles of consumption or capacity within each group.
This means roughly 40% of sites in each group fall into band 1, while the largest 15% fall into band 4. The thresholds from the period 1 April 2026 to 31 March 2031 are:
| Charging group | Band 1 | Band 2 | Band 3 | Band 4 |
|---|---|---|---|---|
| Low voltage, no agreed capacity (kWh a year) | Up to 3,986 | 3,986 to 13,677 | 13,677 to 27,543 | Over 27,543 |
| Low voltage, with agreed capacity (kVA) | Up to 90 | 90 to 150 | 150 to 250 | Over 250 |
| High voltage (kVA) | Up to 500 | 500 to 1,100 | 1,100 to 2,000 | Over 2,000 |
Source: Distribution Connection and Use of System Agreement (DCUSA), Residual Charging Bands and Thresholds
3. Applying the fixed daily charge
Once allocated to a band, the site pays the fixed daily residual charges set for that band, in pounds per site per day. Unlike a unit rate, this charge stays the same however much electricity the site uses, so reducing consumption will not lower it during the banding period.
DUoS residual charges are set by each distribution network operator (DNO), so the amount for the same band varies by region, while TNUoS residual charges are set nationally by the National Energy System Operator (NESO), so they are the same across Great Britain.
4. Keeping the band for the set period
Sites stay in their allocated band for the full network banding period, currently from 1 April 2026 to 31 March 2031.
A change in usage or capacity during that time does not automatically move a site to a different band, although a review can be requested in certain circumstances.
TCR charges timeline
The TCR has been introduced in stages since Ofgem launched the review, with bands now reset every five years. The key milestones are:
| Date | Milestone |
|---|---|
| August 2017 | Ofgem launches the Targeted Charging Review |
| Late 2019 | Ofgem publishes its decision, confirming the move to fixed residual charges. |
| 2021 | Remaining embedded benefits for smaller generators are reduced. |
| April 2022 | DUoS residual charges become fixed daily charges, based on charging bands. |
| April 2023 | TNUoS residual charges become fixed daily charges, using the same bands. |
| April 2026 | The first banding period ends, and sites are re-banded with updated thresholds. |
| March 2031 | The current banding period ends, with sites due to be re-banded from April 2031. |
How do TCR charges appear on bills?
How TCR charges appear on a business electricity bill depends on the type of business energy contract:
- Fixed-price contracts: Common among smaller businesses, these embed TCR charges in the business electricity standing charge, which is why many businesses saw their standing charges rise sharply from 2022.
- Pass-through contracts: Typical of larger half-hourly metered sites, these usually show TCR charges as separate daily charges, labelled for example as DUoS fixed or residual charges and TNUoS demand residual charges, alongside the time-banded DUoS unit rates.
Can a business reduce its TCR charges?
A business can only reduce TCR charges by moving a site into a lower band, removing meters it no longer needs, or receiving relief through other schemes. The common ways of doing so are:
- Checking its band is correct: If a site’s band is based on incorrect consumption or capacity data, its supplier can ask the distribution network operator (DNO) to review it. Correcting an error can move the site into a lower band.
- Removing unused supplies: Each energised meter pays its own fixed charges, so businesses with several supplies at one site, or meters that are no longer needed, may be able to save by consolidating or de-energising them.
- Reviewing its agreed capacity: Reducing an oversized maximum import capacity lowers capacity charges straight away. If the reduction takes the site below a band threshold, it may also be able to apply for re-banding through an exceptional circumstances process, rather than waiting for the next banding period.
- Claiming network charge relief: Eligible energy-intensive businesses can receive a discount on their network charges through the Network Charging Compensation scheme.
What to do if the TCR band or charge looks wrong
If a business thinks its TCR band or charge is wrong, it can ask for it to be reviewed. Reviews are generally limited to errors in the data used to set the band, rather than changes in usage. The process typically involves the following steps:
1. Gathering the site’s details
Before raising a query, the business should collect the information behind its charges, requesting anything missing from its business energy supplier:
- MPAN: The number that identifies the site, shown on the electricity bill.
- Voltage level: Whether the business electricity connection is low or high voltage, which determines its charging group. This is shown in the site’s connection agreement.
- Measure used for banding: The consumption or agreed capacity figure used to set the band. Agreed capacity is usually shown on half-hourly bills, while consumption figures can be requested from the supplier.
- Assigned band: The band the site has been allocated, which applies to both DUoS and TNUoS. This is usually requested from the supplier, which obtains it from the site’s distribution network operator (DNO).
- Charging year: The period the charges relate to, shown by the billing dates, as rates are updated each April.
- Applicable tariff: The fixed daily charges set for that band, published each year in the DNO’s charging statement for DUoS, and by the National Energy System Operator (NESO) for TNUoS.
2. Comparing the band with the thresholds
Using its own meter data or capacity agreement, the business can check whether its consumption or capacity actually falls within the thresholds for its assigned band.
The checker below shows which band a site’s figures point to:
Answer the questions above to see the site’s likely TCR band.
This gives an indication only. A site’s band is set by its network operator using historical data, so it may differ from its current usage or capacity.
A band that does not match the site's records is the clearest sign of an error.
3. Raising a query with the supplier
The business should contact its supplier with the details and supporting evidence. The supplier can then raise the query with the network operator, which is responsible for allocating bands.
Targeted Charging Review FAQs
Our business energy experts answer commonly asked questions regarding the TCR:
Do TCR residual charges apply to business gas?
No, the TCR only changed how electricity network costs are recovered. Gas network costs are recovered separately through gas transportation charges on business gas bills, which were not part of the review.
Does installing solar remove a site's fixed TCR charges?
No, a site with commercial solar panels still relies on the grid, so it still pays the fixed daily charges for its band.
Solar can still reduce the electricity a site consumes from the grid, and for sites banded by consumption, lower grid usage may lead to a lower band at the next re-banding.
Can two premises with similar annual kWh have different TCR charges?
Yes, for several reasons. One site may be banded by consumption and the other by agreed capacity, they may be connected at different voltages, or they may be in different regions, as DUoS residual charges vary between network operators.
Does changing the electricity supplier change my network charging band?
No, the band belongs to the site rather than the supplier, so it stays the same after switching business energy supplier.
However, how the charges are presented, and whether they are bundled into the standing charge, can vary between suppliers and contracts, so it is worth checking this when businesses compare business electricity quotes.
Are tenants or landlords responsible for TCR-related costs?
It depends on who holds the electricity supply. Where the tenant has its own supply contract, it pays the charges directly. Where the landlord holds the supply, the costs are usually recovered from tenants through service charges or recharges, in line with the lease.
Why does a half-hourly metered site have a higher fixed network charge despite low usage?
Most half-hourly metered sites are banded by their agreed capacity rather than their consumption.
A site with a large agreed capacity can be placed in a higher band even if it uses relatively little electricity, which is why reviewing an oversized capacity can be worthwhile.